berlin’s biggest edm annual open-air festival



KARMOD

We will create a drawing for their approval, a number of the units that they produce, on the Great Boardwalk to Fame at Music City Manitoba, and show the extent that they contribute to emergencies, around the world and depict the scale in which they can produce these accommodations.

These life sized “statue display sets” will be made exclusively for Music City Manitoba by:

We will create a design for this Boardwalk Display of their different designs of the units they produce.

.

We will display it the millions of visitors to Music City Manitoba, for a lifetime!

 

This spectacular display will be included in their sponsored mile of 

the Great Boardwalk to Fame.

 

THIS SPONSOR

Will receive:

1 – Lifetime Seat on the Advisory Board of The Music City Manitoba Corporation.

1% of Net profits per year for life.(Very substantial return) 

(When completely finished & operating at 100 % capacity, this could mean up to $20,000,000.00 per year).

See Projected Financials

 

Lifetime Display of their Boardwalk Setting.

A lifetime Kiosk Display in MCM – Event Centre (Beginning when finished)

3 – 10 sec impressions per hour. 14 hours per day, for 10 years.

42 impressions per day on our 6′ x 8′ LED Screens, on the Great Wall/Walk of Fame.

15,330 impressions per year = 153,300 impressions in 10 years.

 

Numerous name mentions on all Radio & TV Advertising.

 

Please Note:

Payment of these sponsorships can be made by cheque, etransfer, or with goods & services, amounting to 

the cost of the sponsorships, in a reasonable timeline, agreed to by Music City Manitoba.

You will also receive a VIP Black Gold Membership Card 

with which you will get as many shows, of your choice, per year,

that you may want.

 

cool, cozy & comfortable.

Music city manitoba

      The Isle of Wayne, Manitoba, Canada

beginning

    June 13, 2027


Since 1986, Karmod has been producing prefabricated buildings that ensure building safety in prefabricated building industry, stand out with their ergonomics, are fast produced and can be installed on site in a short span of time with its expertise in the industry, production technology and modern production facilities. 

The structures prepared by Karmod with next generation prefabricated model and a demountable system are safely used in more than 120 countries today. With our next generation prefabricated buildings, we have become a solution partner for numerous large projects such as power plants, oil exploration, natural gas, mining, road construction, branded mass housing, airport constructions thanks to our production and on-site installation of prefabricated site buildings. We successfully deliver ready-to-use buildings to projects that carry importance in a short time with our many prefabricated construction site structures, especially prefabricated offices, prefabricated dormitories and cafeteria buildings, thus making a significant contribution to the timely start of projects. 

In addition, we prepare safe living spaces with long-lasting prefabricated structures, from individual housing to prefabricated mass housing, emergency settlement units to social facility structures, and hospitals to schools.

gates open in

Days
Hours
Minutes
Seconds
Secure your place and pre register now

Our possible ONE MILE sponsoring Partners

The Province of Manitoba

The Manitoba Metis Federation

The Canadian Government

Molson Canadian

Manitoba Hydro

Norway House Cree Nation

Karmod

PCL Construction

BDC

VIA Rail

Air Canada

Manitoba Liquor & Lotteries

Suncor Energy

Manitoba Public Insurance

Assembly of Manitoba Chiefs

The Royal Canadian Mint