Manitoba Hydro’s Keeyask Generating Station on The Nelson River.


MaNITOBA HYDRO










We will create a design for this one mile of sponsored Boardwalk Display, of all the dams & power stations, in Manitoba.

We will display it to millions of visitors to Music City Manitoba, for a lifetime!

Check the videos for an idea of how we would do that.

 

This spectacular display will be included in their sponsored mile of 

the Great Boardwalk to Fame.

This Boardwalk Display will be made exclusively for Music City Manitoba by:

 

THIS SPONSOR

Will receive:

1 – Lifetime Seat on the Advisory Board of The Music City Manitoba Corporation.

1% of Net profits per year for life.(Very substantial return) 

(When completely finished & operating at 100 % capacity, this could mean up to $20,000,000.00 per year).

See Projected Financials

Lifetime Display of their Boardwalk Setting.

A lifetime Kiosk Display in MCM – Event Centre (Beginning when finished)

3 – 10 sec impressions per hour. 14 hours per day, for 10 years.

42 impressions per day on our 6′ x 8′ LED Screens, on the Great Wall/Walk of Fame.

15,330 impressions per year = 153,300 impressions in 10 years.

Numerous name mentions on all Radio & TV Advertising.

 

Please Note:

Payment of these sponsorships can be made by cheque, etransfer, or with goods & services, amounting to 

the cost of the sponsorships, in a reasonable timeline, agreed to by Music City Manitoba.

You will also receive a VIP Black Gold Membership Card 

with which you will get as many shows, of your choice, per year,

that you may want.

 

 

the power is in our hands...

Music city manitoba

The Isle of Wayne, Manitoba, Canada

beginning

June 13, 2027

Manitoba Hydro is the primary electricity provider in Manitoba, with 16 hydroelectric generating stations located on the Nelson, Winnipeg, Saskatchewan, Burntwood, and Laurie rivers. 

These stations collectively supply the majority of the province’s electricity, with additional support from two fossil-fuel plants, four diesel generators, and two wind farms. 

The total installed capacity of Manitoba Hydro is approximately 5,701 MW, with the Nelson River Hydroelectric Project being the largest, producing 27.4 terawatt-hours annually, meeting over 75% of provincial demand

manitoba generating stations


This is a list of public utility electrical generating stations in Manitoba, Canada.

Manitoba produces close to 97% of its electricity through hydropower. The most important hydroelectric development in Manitoba is the 3,955- megawatt Nelson River Hydroelectric Project. Its five power stations produced 27.4 terawatt-hours of electricity in 2014-2015, meeting 75.7% of the provincial demand.

Manitoba Hydro, the government-owned public utility is the main power generator in the province with 15 hydroelectric generating stations, 2 fossil-fueled plants and 4 diesel generators , for a total installed capacity of 5,701 MW.


Friday 26 June
Saturday 27 June
Sunday 28 June

gates open in

Days
Hours
Minutes
Seconds

Secure your place and pre register now

Our possible one mile sponsoring Partners

The Province of Manitoba

The Manitoba Metis Federation

The Canadian Government

Molson Canadian

Manitoba Hydro

Norway House Cree Nation

Karmod

PCL Construction

BDC

VIA Rail

Air Canada

Manitoba Liquor & Lotteries

Suncor Energy

Manitoba Public Insurance

Assembly of Manitoba Chiefs

The Royal Canadian Mint